Getting Started
S E C T I O N 2
5
The following sections provide a complete description of how to wire and configure devices and zones.
2.1 Installation Steps
The following steps are provided to assist with the installation of the panel. It is suggested that you read over this
section briefly to get an overall understanding of the order of installation. Once this is done carefully work through
each step. Working from this plan will help reduce problems and reduce the overall installation time required.
Step 1 Create a Layout
Draw a rough sketch of the building and include all alarm detection devices, zone expanders, keypads
and all other modules that are required.
Step 2 Mounting the Panel
Locate the panel in a dry area, preferably located near an unswitched AC power source and the incoming
telephone line. Before attaching the cabinet to the wall be sure to press the five circuit board
mounting studs into the cabinet from the back.
Complete all wiring before applying AC or connecting the battery
.
Step 3 Wiring the Keybus
(Section 2.3)
Wire the Keybus to each of the modules following the guidelines provided.
Step 4 Assigning Zones to Zone Expanders
(Section 2.5)
If zone expander modules are being used the modules must be configured so the panel knows which
zones are assigned to each expander. Follow the guideline provided to assign zones to expanders.
Step 5 Zone Wiring
(Section 2.9)
Power down the control panel and complete all zone wiring. Follow the guidelines provided in Section 2.9
to connect zones using normally closed loops, single EOL resistor, double EOL resistors, Fire zones and
Keyswitch Arming zones.
Step 6 Completing Wiring
Complete all other wiring including bells or sirens, phone line connections, ground connections or any
other wiring necessary. Follow the guidelines provided in Section 2.2 “Terminal Descriptions”.
Step 7 Power up the Control Panel
Once all zone wiring and Keybus wiring is complete, power up the control panel.
The panel will not power up if only the battery is connected.
Step 8 Keypad Assignment
(Section 2.6)
Keypads must be assigned to different slots to be properly supervised. Follow the guideline provided in
Section 2.6 to assign keypads.
Step 9 Enabling Supervision
(Section 2.7)
After all modules have been wired to the Keybus, supervision must be enabled. Once supervision is enabled,
the panel will be able to indicate module communication faults. Follow the guidelines provided in Section 2.7.
Step 10 Programming the System
(Sections 4 and 5)
Section 4.0 provides a complete description of how to program the panel. Section 5.0 contains complete
descriptions of the various programmable features, what options are available and how the options function.
The Programming Work Sheets should be filled out completely before attempting to program the system.
Step 11 Testing the System
Test the panel completely to ensure that all features and functions are operating as programmed.